Solar net metering in Madhya Pradesh allows consumers to export surplus daytime solar units to the MPMKVVCL/MPPKVVCL grid. A bi-directional meter records imported vs exported units, and you only pay for the net units consumed. Excess units roll over monthly across the financial year (settled every March 31st).

DISCOM Net-Meter SLA
7–10 Days Guarantee
Settlement Cycle
Annual Roll-over (April–March)
Max Sanctioned Load
100% of Connected Contract Demand
Energy Banking Rate
1:1 Unit Banking for Residential
MPMKVVCL Bi-Directional Solar Net Meter Installation in Bhopal
📷 MPMKVVCL Bi-Directional Solar Net Meter Installation in Bhopal

1. How Does Bi-Directional Net-Metering Work in MP?

When you install an on-grid rooftop solar system in Madhya Pradesh, your conventional unidirectional energy meter is replaced by a smart bi-directional net-meter sanctioned by MPMKVVCL (Bhopal) or MPPKVVCL (Indore).

During bright daylight hours (9:00 AM to 5:00 PM), your solar panels generate peak electricity. Your household appliances consume what they need, and any excess units are instantaneously fed back into the DISCOM grid. The net-meter runs backwards, banking every exported kWh unit at a 1:1 parity.

✓ Import Reading (kWh): Units drawn from the DISCOM grid during night or overcast periods.
✓ Export Reading (kWh): Surplus solar units injected into the DISCOM grid during day hours.
✓ Billed Units = (Total Imported Units) - (Total Exported Units).

2. MPMKVVCL Solar Net Metering Application Procedure

Maxira Solar's liasoning department interfaces directly with your local DISCOM sub-division (Zone office) in Bhopal, Indore, or surrounding circles:

1. Load Feasibility Check: Submission of application along with existing sanction load certificate.

2. Transformer Capacity Verification: Verification that local Distribution Transformer (DT) capacity does not exceed 85% solar penetration limit.

3. Meter Testing & Calibration: Bi-directional smart meter procurement and laboratory calibration at DISCOM NABL-accredited test bench.

4. Physical Commissioning & Synchronization: Official energization ceremony witnessed by Junior Engineer (JE) and Assistant Engineer (AE).

✓ Sanction Limit: Up to 100% of your sanctioned connected load in MP for LT domestic consumers.
✓ Turnaround Time: Maxira Solar delivers net-meter commissioning in just 7 to 10 business days.

3. What Happens to Excess Solar Units at the End of the Year?

Under the Madhya Pradesh Electricity Regulatory Commission (MPERC) Rooftop Solar Regulations, unutilized energy credits are carried forward month-to-month until March 31st of each financial year.

At the end of March, any remaining surplus energy credits are purchased back by MPMKVVCL/MPPKVVCL at the average power purchase cost (APPC) tariff rate, credited directly to your electricity bill.

✓ Summer Banking: High summer generation offsets peak AC power consumption during May and June.
✓ Monsoon Balance: Accumulated winter credits help offset reduced monsoon solar generation.
Interactive Tool

Calculate Your 25-Year Solar Savings

Instant calculation of monthly bill offset and net DBT subsidy under PM Surya Ghar.

PM Surya Ghar Subsidy Calculator

Calculate Your Rooftop Solar Sizing & Net Savings

Slide your monthly electricity bill to calculate recommended plant kW, direct DBT subsidy, and 25-year financial returns.

MNRE DBT GUARANTEE
Direct credit to customer bank A/C
Quick Select Average Monthly Bill:
Monthly Electricity Bill ₹3,500 / mo
₹1,000 (1 kW) ₹7,000 (5 kW) ₹25,000+ (Commercial)
PM Surya Ghar Muft Bijli Yojana Structure

• 1 kW: ₹30,000 DBT  |  2 kW: ₹60,000 DBT  |  3 kW – 10 kW: ₹78,000 Flat DBT

Estimated Financial Summary
Central India Model
Recommended Capacity
3 kW System
Monthly Generation
375 Units
Direct DBT Subsidy
₹78,000
Net System Cost
₹87,000
Projected Annual Power Savings
At ₹7.5/unit average DISCOM tariff
₹37,800 / yr
Estimated Capital Payback: 2.3 Years 25-Yr Lifetime Savings: ₹9.45 Lakhs
Schema Structured FAQs

Frequently Asked Questions

Solar Knowledge Base

Frequently Asked Questions

Maxira Solar provides the DISCOM-approved secure bidirectional smart meter, NABL testing fees, and installation charges included within our turnkey EPC package with zero hidden costs.
Yes. Maxira Solar assists in applying for sanctioned load enhancement with MPMKVVCL simultaneously with the solar net-metering application.
Yes. Single-phase net metering is permitted for systems up to 3 kW / 5 kW, while 3-phase net metering is standard for 5 kW, 10 kW, and higher commercial/residential connections.
AR
Authored & Technically Reviewed By

Er. Abhishek Raikwar

Founder & Lead Solar EPC Engineer • MNRE Certified Professional · 10+ Yrs Rooftop EPC Experience

Related Solar Engineering Guides

Chat with Solar Engineer